Al Dur 95 MW Solar PV Power Station — civil works
Civil works subcontract — cable trench excavation, substation site leveling and civil ground preparation for one of Bahrain's landmark renewable energy projects.
Clean power for Bahrain's national grid
The Al Dur Solar Photovoltaic (SPV) Power Station delivers 95 megawatts of clean solar power to the national grid operated by the Electricity and Water Authority (EWA) — a significant milestone in Bahrain's national energy strategy.
AIMCON Contracting W.L.L. was awarded the civil works subcontract under the main EPC contractor TBEA Co., Ltd. AIMCON's scope covered cable trench excavation across the full solar array field, substation area site leveling and the associated civil ground preparation for the project's electrical infrastructure.
What AIMCON delivered
- Cable trench excavation across the 95 MW solar PV field
- Substation area ground leveling and preparation
- Rock breaking and excavation with heavy equipment
- Spoil removal and site clearance
- Foundation pile area preparation for panel mounting structures
- Coordination with TBEA site management and EWA representatives
Zero Lost Time Injuries
- Daily toolbox talks before any excavation or earthmoving
- Pre-start inspection of every excavator, dump truck and support vehicle
- Calibrated noise monitoring (Di-Log DL7103), results shared with TBEA and EWA
- Permits for hot work, confined space and excavation
- 100% PPE compliance and heat stress management
- World Environment Day awareness campaign on site
On site at Al Dur